Steel structure erection on live and new plant sites

We erect structural steel on greenfield sites and inside operating plants, with planned lifts, controlled alignment and documentation ready for your handover.

Crane lowering a steel beam into a plant structure while ironworkers guide it
Scope

What we take on

  • Plant buildings

    Main and auxiliary buildings, sheds and enclosures.

  • Pipe and cable racks

    Rack erection, alignment and bolting ready for piping and cabling.

  • Technological structures

    Structures supporting equipment, ducts and conveyors.

  • Platforms and access

    Platforms, galleries, staircases and handrails.

  • Bolting and alignment

    Torque-controlled bolting, levelling, plumbing and grouting coordination.

  • Shutdown erection

    Replacement and new steelwork during planned outages.

Method

How the work runs

  1. 01

    Site survey

    We check foundations, access, lifting zones and interfaces before mobilising.

  2. 02

    Method and lift plan

    Erection sequence, lift plans and safety measures agreed with your site team.

  3. 03

    Mobilisation

    Crew, tools and equipment arrive with permits and inductions in place.

  4. 04

    Erection

    Members erected in sequence and temporarily braced until final bolting.

  5. 05

    Alignment and checks

    Line, level and plumb checked and recorded against drawing tolerances.

  6. 06

    Handover

    Punch points closed and records handed over.

Where we work

Built for power, nuclear and process plants

  • Thermal power plants
  • Nuclear power plants
  • Power transmission and utilities
  • Process and heavy industry

Safety first

We work inside your permit-to-work system and site rules. Every person is inducted before they start.

Your quality plan

We work to the quality plan, inspection stages and documentation your contract specifies.

Traceable records

Materials, welds, inspections and tests recorded so your handover file is complete.

One contractor

Fabrication, erection and upkeep from one team, so nothing is lost between shop and site.

Questions

Steel Structure Erection: common questions

Do you work inside operating plants?

Yes. We work within your permit-to-work system and plan the job around your operating and outage constraints.

Do you supply cranes and lifting equipment?

We plan the lifts for each job and confirm the lifting arrangement, owned or hired, in our proposal.

Can you take fabrication and erection as one package?

Yes. One contractor for both removes the interface between shop and site.

Have a scope, drawing set or tender?

Send us what you have. We review every enquiry with an engineer and come back with questions or a proposal.

Send an enquiry