Send an enquiry
Service 03

Pipeline and piping erection, from first spool to test readiness

We erect process and utility piping to your isometrics and specification, then support your testing and flushing so lines are handed over ready for service.

Pipefitters aligning a flanged joint on a large pipeline
Scope

What we take on

  • Process piping

    Carbon steel, alloy steel and stainless steel lines to isometric drawings.

  • Utility lines

    Cooling water, raw water, compressed air, fire water and service lines.

  • Rack piping

    Long runs on pipe racks and sleepers, with expansion and support details.

  • Supports and hangers

    Fixed, guided, sliding and spring supports installed to design.

  • Tie-ins

    Hot work and cold tie-ins into existing systems during planned windows.

  • Test support

    Hydrostatic and pneumatic test support, flushing and reinstatement.

Method

How the work runs

  1. 01

    Isometric review

    We check isometrics, line lists and specifications against site conditions.

  2. 02

    Spool control

    Spools tracked by line and joint so nothing is lost between yard and site.

  3. 03

    Erection and fit-up

    Spools placed, aligned and fitted to the support design.

  4. 04

    Welding

    Site joints welded to the procedures and qualifications your contract requires.

  5. 05

    Testing

    Test packs prepared, tests supported and results recorded.

  6. 06

    Handover

    Lines reinstated, punch points closed and records handed over.

Where we work

Built for power, nuclear and process plants

  • Thermal power plants
  • Nuclear power plants
  • Power transmission and utilities
  • Process and heavy industry

Safety first

We work inside your permit-to-work system and site rules. Every person is inducted before they start.

Your quality plan

We work to the quality plan, inspection stages and documentation your contract specifies.

Traceable records

Materials, welds, inspections and tests recorded so your handover file is complete.

One contractor

Fabrication, erection and upkeep from one team, so nothing is lost between shop and site.

Questions

Pipeline Erection: common questions

Do you also fabricate the spools?

Yes. We can fabricate spools in our shop and erect them on site, or erect spools supplied by others.

Do you handle tie-ins on running plants?

Yes, within your permit system and outage windows, planned with your operations team.

Do you prepare test packs?

We prepare and maintain test packs to the format your project uses and support the tests on site.

Have a scope, drawing set or tender?

Send us what you have. We review every enquiry with an engineer and come back with questions or a proposal.

Send an enquiry